Home  /  How restumping works

How restumping works in Gippsland and how long it takes

No source we read says how long house restumping takes. This guide sets out the steps in order, the rainfall by station, and what to put in a written programme so the builder commits to dates in writing.

How long does house restumping take? The sources do not say

We found no source that says how long house restumping takes, whether you can stay in the house while it is done, or which season is best. We would rather say so than print a number we cannot check. What a source can give is the order of the steps, and the builder can give the programme. Ask for it in writing, with dates, before you agree to anything.

The steps of a house restump, in order

The steps below are assembled from the Building and Plumbing Commission's surveyor page, a building inspector's guide and a repair vendor's guide. Not every job has every step, and the order can change.

  1. A subfloor inspection. Someone looks at the stumps, bearers and joists and writes down what they find.
  2. A surveyor is appointed. Only the owner or the owner's agent may appoint a private building surveyor, and a builder cannot appoint one for domestic building work under a domestic building contract (Building and Plumbing Commission surveyor page). A permit is sought if the surveyor says one is needed.
  3. A written contract. Where the contract is over the insurance threshold, the builder gives you the policy and certificate of insurance before you pay a deposit (Consumer Affairs Victoria). Contract and deposit rules change by 1 December 2026, so check them at the time you sign.
  4. The house is lifted. A vendor's guide says hydraulic jacks or similar lift and adjust the structure, and the building may be lifted temporarily.
  5. Old stumps come out and new stumps go in. One vendor's guide says the old stumps are replaced, usually with concrete or steel.
  6. Bearers and joists are repaired or replaced. That is found once the subfloor is open. A building inspector's guide says damaged or decayed stumps and sub-floor elements are completely replaced when a house is jacked.
  7. The floor is relevelled.
  8. Drainage, ventilation and termite checks under the house. The soils and subfloor guide covers the figures.
  9. Final inspection and certificates. A registered building surveyor, private or municipal, issues permits, occupancy permits and certificates of final inspection.
Looking along a dry, tidy subfloor under a timber house, a row of concrete stumps carrying timber bearers and joists, daylight from a subfloor vent at the far end and a torch beam across the dirt.
Illustration: a dry subfloor with concrete stumps carrying bearers and joists, the layout a builder and surveyor work from

What jacking can do inside the house

Lifting a house can disturb what is attached to it. One building inspector's guide says jacking can damage doorframes, plaster, tiles and ducted heating. Whether that happens to your house, and who repairs it, is not something a source can tell you. Ask the builder who repairs what, and whether it is in the quote. The cost guide lists it among the items that move a price.

The same applies to bearers and joists, which are found sound or not once the floor is open. A part job can grow for the same reason, and the partial restumping page explains how to ask for the price of extra work before it is needed.

Rainfall by station, and what it does not tell you

Owners often ask about rain, so here are the Bureau of Meteorology station means. They describe the district, not the job, and no source we read links rainfall to house restumping. Station records vary: the Sale station closed in 1945 and its figures are history, not current weather.

StationRainfall recordsWettest month (mean)Driest month (mean)
Bairnsdale Airport (Bureau of Meteorology)1942 to 2026November, 80.6 mmAugust, 36.9 mm
Wonthaggi (Bureau of Meteorology)1911 to 2026August, 102.4 mmFebruary, 45.3 mm
Sale, closed station (Bureau of Meteorology)1870 to 1945October, 63.0 mmJuly, 41.5 mm

The stations differ in how wet their wettest and driest months are, but that is all the table says. Ask the builder how a wet spell would change the programme, and who decides when ground is too wet to work. We found no source that answers either question.

No source says how long a restump takes. Ask for the programme in writing.

What to put in the written programme

A written programme is the builder's commitment, and it is what you can compare between quotes. Ask for it to list:

  • the start date, the number of working days and what happens if weather stops work
  • access to the subfloor, and whether the house can be lived in while it is lifted
  • who disconnects and reconnects water, gas, electricity and the phone line, and when
  • when the surveyor is booked for inspections and the final inspection
  • what repairs are included, and how extra work is priced and agreed in writing
  • drainage and ventilation: the National Construction Code sets cross-ventilation and clearance figures for new subfloors (NCC 2022 Housing Provisions Part 6.2), and the surveyor decides what applies to your job

A house that is not lived in needs the same list with one addition: who holds the keys and how you are sent photos and updates. The quote checklist carries the rest, and the permit page explains who does what with the paperwork, checked 6 November 2026. To start, send the details of your house, and the enquiry goes to a local builder.

What this guide cannot do

This guide cannot tell you how long your house restumping job will take, whether you can stay in the house or when to book it. No source we read says, and the answer depends on the house, the access and the builder. We cannot promise that any weather or rainfall pattern helps or hinders the work. We are a referral service: we pass your enquiry to a local builder, who inspects, quotes and gives the programme, and who holds any registration or insurance that applies. A registered building surveyor decides what inspections the job needs.

Written November 2026, checked 6 November 2026

Check the current rules before you rely on this

This page describes the order of the steps in a house restumping job, the rainfall by station and what to put in a written programme. It describes the rules in general terms as they stood in November 2026, checked 6 November 2026. Standards, forms, thresholds and fees change.

The authoritative sources are BPC, appointing a building surveyor, CAV, insurance and insolvency for home building, Bureau of Meteorology, Bairnsdale Airport climate statistics (station 085279) and Wellington Shire Council, building permits (lists 'Reblocking or restumping of an existing building: Permit Required.'). Where anything here differs from those sources, they are right and we are not.

We are not builders, building surveyors, regulators or lawyers. For what applies to your job, ask the builder which registration they hold and check it on the Building and Plumbing Commission register, then ask a registered building surveyor and your council what is needed. Contract, deposit and payment rules change by 1 December 2026.

Accurate at the time of writing, November 2026. Always check the source before relying on it.

Questions

Common questions

Who inspects the work when house restumping is finished?

The Building and Plumbing Commission says a registered building surveyor, private or municipal, issues permits, occupancy permits and certificates of final inspection. Where the surveyor says a permit is needed, ask when the inspections are booked and who arranges access for them. Put those dates in the written programme.

What happens to doors and plaster when the house is lifted?

One building inspector's guide says jacking can damage doorframes, plaster, tiles and ducted heating. We cannot say whether it will in your house. Ask the builder who repairs what and whether the repairs are in the quote, so the question is settled in writing before the house is lifted.

What should a written restumping programme list?

Ask for the start date, the working days, how weather delays are handled, access to the subfloor, who disconnects and reconnects services, the surveyor's inspection dates, the repairs included and how extra work is priced. We found no source that supplies a standard programme, so the list is what you ask the builder to commit to.

Does rain stop a house restumping job?

We found no source that answers this. The Bureau of Meteorology station means show how rainfall varies by month and by town, but no source links them to the work. Ask the builder how a wet spell would change the programme and who decides when to stop.

Who disconnects and reconnects services during a restump?

We found no source on this, so ask the builder. The house may have water, gas, electricity or phone lines under the floor, and someone has to deal with them when the house is lifted. Put the answer in the written programme, with the person responsible and the timing.

What does jacking a house mean?

A repair vendor's guide says hydraulic jacks or similar lift and adjust the structure, and that the building may be lifted temporarily while stumps are replaced. Jacking is the lifting step. It is also the step one building inspector's guide links to possible damage to plaster, doorframes and tiles.

Are bearers and joists replaced during a restump?

Sometimes. Whether they need repair or replacement is found once the subfloor is open. A building inspector's guide says damaged or decayed stumps and sub-floor elements are completely replaced when a house is jacked. Ask how extra bearer or joist work is priced and agreed before the job starts.

What if I am away while the work is done?

Ask the builder who holds the keys, who lets the surveyor in and how you will be sent photos and updates. Only the owner or the owner's agent may appoint the surveyor, so decide who your agent is before work starts. The Cowes and Phillip Island page covers holiday houses in more detail.

Next step

Send the town and what the house is doing

The town, the type of house, whether anyone lives in it and what you have noticed under or inside it. That is usually enough for a builder to ask the right questions before an inspection.